NEWS ABOUT US PROFILES CAREERS CONTACT COMPANY MAGAZINE Home
choose one

AHTS launched every two months

Every two month's time will be marked with launch of another AHTS from the building berths / slipways of Northern Shipyard (Stocznia Polnocna SA), member of REMONTOWA Group. The most recent such occasion took place mid September, when the fifth unit of the B 844 type AHTS vessel Allison Tide (B 844/5), was launched. The ship is being built at Northern Shipyard to the order of REMONTOWA for delivery to renowned, New Orleans (USA) based Tidewater Marine Inc.
The multi-purpose anchor handling tug and supply vessel Allison Tide is designed as capable of operation in relatively shallow waters comparing to competing designs with similar deck payload, power and other principal characteristics.
The 70.00 m long and 15.50 wide vessel is powered with two main engines, rated at 5000 HP, which enables to achieve service speed of 13 knots and maximum speed of 15 knots.
Open work deck area of 400 sq m and 1000 t capacity facilitates supply functions in addition to 55 underdeck tanks for water, fuels and dry bulk drilling materials. The ship will be equipped with fire-fighting system of 1200 cu m / h capacity.
The successful B 844 series of vessels is being built to design supplied by NED consulting naval architects from REMONTOWA Group and under supervision from ABS. Delivery of the ship is planned for February 2008.
The launching of the 6th unit from the same series is scheduled for mid October, while number 7 is expected to be launched in January 2008, and no. 8 - in March 2008.


Copyright 2005 Remontowa